Verigy 93k Tester Manual Jun 2026
A graphical and hierarchical representation of the execution sequence. It controls the exact path a device takes based on pass/fail criteria.
By using a single platform for both engineering development and high-volume manufacturing, companies reduce the "time-to-market." 2. The Role of SmarTest Software
: Create the .pin layout to link your silicon pad names to the tester channels. Set up multi-site configurations (e.g., 4-site, 8-site, or 16-site testing) to optimize throughput. verigy 93k tester manual
This physical channel is later mapped to a logical name (DUT pin name) within the SmarTest software workspace. 2. The SmarTest Software Workspace
The Verigy 93k utilizes internal reference standards to perform automated calibration. This step compensates for temperature drifts, cable lengths, and internal propagation delays. Run System Cal weekly or whenever the test site configuration changes. Diagnostics Suite A graphical and hierarchical representation of the execution
The 93K’s hardware documentation is extensive, primarily because of its modular architecture. Core to any operation is the . The system supports various pin modules, such as the PS800 digital pin electronics, which are the basic building blocks for connecting the tester to the Device Under Test (DUT). This modular approach allows for flexible configuration, enabling users to add or remove pin modules as needed, with some configurations supporting up to 1,024 digital signal pins. The physical interface between the tester and the DUT is often a pogo tower , and ensuring correct mechanical and electrical compatibility is a key step defined in hardware setup procedures.
At the heart of the V93000 is the concept of a "platform." Unlike earlier testers that were hard-wired for specific tasks, the 93k was designed with a universal per-pin architecture. This means every pin on the tester can perform multiple functions—digital, analog, or power—without requiring massive hardware reconfigurations. The Role of SmarTest Software : Create the
In addition to the manual, Advantest and other organizations provide supplementary educational resources to help engineers build their V93000 skills: